• chilprotechtion.jpg
  • Fundus Camera.jpg
  • low vision copy.jpg
  • OPD copy.jpg
  • OT.jpg
  • primary eye care trainig.jpg
  • school screening.jpg
  • screening copy.jpg
  • teh staff.jpg
  • waiting copy.jpg
  • wsd 2014 web copy.jpg
  • voucher project.gif
Home About Us
The land on which the Takeo Eye Hospital sits previously housed the tuberculosis department of the Provincial Hospital
dating back to the 1960s.
 
In 1996 the concept of an eye hospital to train Cambodian doctors and nurses came into being when the Maryknoll -
Community Based Rehabilitation Program for the Blind came across numerous patients needing eye treatment.
 
The collaborative efforts with the Ministry of Health and other NGOs brought about the formulation of the training curriculum
for Basic Eye Doctors and Basic Eye Nurses. With assistance of the Provincial Health Department the former TB hospital
was renovated into what became the Takeo Eye Hospital which received its first patient on 8 February 1997.
 
The hospital had a 64 bed capacity, but the daily in-patients quickly reached between 40 - 60 patients. Most often the
patients occupied the space around the hospital in the walkways that ringed the wards.
By 2000 Takeo Eye Hospital was handed over to Caritas Cambodia and the Daughters of Charity of St. Vincent de Paul with
Sr. Myrna Porto replacing Fr. John Barth the founder.
 
All along the way, Christoffel Blinden Mission (cbm) of Bensheim, Germany supported the Takeo Eye Hospital both with the
annual budget that includes, operating costs, ophthalmic instruments, medicines, and medical experts as medical director.
before 1997 Original building before renovation in 1997

teh building

Before 1997 Original building before renovation in 1997  Building 2010-Now

 

The hospital continues to carry out the memorandum of understanding with the ministry of health to train doctors and nurses
and other personnel, to provide eye care services, develop provincial eye units and build the new takeo eye hospital which is
being dedicated today, 6 april 2010 by HIS MAJESTY KING NORODOM SIHAMONI. 
 
On 27 november 2007, the ground breaking ceremony took place for the new takeo eye hospital building. the actual
construction started on 2 april 2008. the student house and staff house were completed by 12 march 2009 and phase
one of the new hospital construction was finished on 18 june 2009. the first eye operation was performed in the
new operating room on 29 june 2009.the old building was demolished on 7 july 2009 and construction of the second
and final phase was finished by 19 february 2010. 
 
The development of takeo eye hospital was facilitated through the regular collaboration with the ministry of health, the
 
national program for eye health, the local government offices of takeoprovince and the takeo provincial health office.
 
the land,electricity and water supply are provided by the takeo local government and the provincial health department

 line

 

bout Us

History:

 Organizational Structure:

 Organization ChartCaritas

 

  CTEH Organization Chart 2015

line